Portfolio

A selection of recent projects, with photos from the field. Click a photo to see it larger.

Alpine Park

Calgary

  • Completed tall precast block retaining wall with a stone-textured face and a metal fence along its crest beside a pathway.
  • Long stone-textured block retaining wall with a crest fence, viewed from a paved pathway with patches of snow on the verge.
  • Tall stone-textured block retaining wall beside a newly paved pathway, with a road and streetlights running parallel.
  • Corner of a tiered stone-textured block retaining wall with a metal fence along the crest, seen from disturbed ground below.
  • Excavator sets large precast concrete retaining wall blocks on a curved wall, with drain rock placed behind the top course.

CNR Overpass

Red Deer

  • Completed precast MSE panel wall beside a rail track, with a crew working along the underside of new bridge deck formwork.
  • Precast MSE wall panels with protruding steel bars beside a rail track, below bridge deck formwork with a crew member on top.
  • Smooth drum roller and plate compactor working granular backfill beside a bridge abutment on piles, with formwork and rebar above.
  • Precast MSE wall panels with protruding steel bars meet a wire mesh wing face against fill, under bridge deck formwork.
  • Telehandler lifts a precast concrete panel on chains over a rail track as crew members guide it beneath an overpass.
  • Rebar mat tied over the lower face of a precast MSE panel wall beside a rail track, seen from beneath the steel bridge girders.
  • Crew members run a plate compactor while a smooth drum roller compacts granular backfill behind a formed bridge abutment.
  • Conveyor places granular backfill under a bridge abutment cap on piles while a loader and smooth drum roller work nearby.
  • Crew member guides a precast MSE wall panel hung from a boom, with steel piles in corrugated sleeves rising behind the wall.
  • Compact track loader spreads granular backfill over steel ladder reinforcement behind precast MSE panels, with a plate compactor nearby.

Frank Channel Bridge Replacement

Northwest Territories

  • Overhead view of a precast MSE wall corner as a smooth drum roller and plate compactor compact granular fill on top, beside water.
  • Tall precast MSE panel wall with a curved corner rising above granular fill, with a safety barrier chain along its base.
  • Crew member runs a plate compactor over granular fill around tube forms on a bridge approach, beside a steel truss bridge.
  • Precast MSE wall panels braced with timber during setting at a corner unit, with an excavator and survey instrument behind.
  • Excavator parked behind a safety chain beside a new concrete pier cap, beneath a steel truss bridge at the water's edge.
  • Steel ladder reinforcement fanned across granular fill behind precast MSE panels as a crew member checks position with a survey rover.

Palliser Trail

Canmore

  • Row of cast-in-place concrete piles with protruding rebar dowels in an excavation alongside a new building foundation wall.
  • Excavation beside a new building foundation wall with steel piles capped with anchor rods, a mini excavator and a crew member.
  • Curved retaining wall rebar mat against plywood formwork beside an excavated trench lined with timber and safety delineators.
  • Timber lagging wall with plastic safety mesh holding back a gravel slope beside a building foundation with rigid insulation.